Water Supply Center

Water Supply Center

Better Living Condition and Higher Living Quality

Before the development of Dragon Park, underground water from the wells was the major water source for the local resident, no water quality assurance, no guarantee on residents’ health as well.

In the beginning, Dragon Group built 4 small-scale water plants to supply the enterprises and residents in the industrial park. As the expansion of Dragon Park, with hope that people in the industrial park can have better living condition and higher living quality by providing them with more healthy water, our group invested 50 million RMB to build an energy-saving and environment-friendly project – Dragon Park Water Supply Center. The occupancy area and construction area of water supply center is 1000m² and 3,000m² respectively and daily maximum treatment capacity can reach 30,000T.The project was commenced in August 2009 and 8 months later, i.e. April 2010 finished and put in service. Since then 100,000 people and hundreds of enterprises in the industrial park were able to use high quality water. 


Based on the quantity and portion of the original water’s all kinds of elements, water supply center purify the water by multiple procedures before supply to the enterprises and residents in the industrial park. The treated water satisfies the National Hygienic Standard for Drinking Water (GB5749-2006).

The water supply center is equipped with intelligent control system and monitoring system. The whole water supply center is monitored by the central control room. Every day the water quality supervisors take samples at the water inlet, clean water tank, enterprises-usage water and factories-usages water and residential water for testing and analysis to ensure the quality of water and guarantee the health of residents in the industrial park.

返回